"AGV systems with multi-load carriers: basic issues and potential benefits",
Journal of manufacturing systems, vol. 16, no. 3: Elsevier, pp. 159–174, 1997.
Different resource management policies in multi-mode resource constrained multi-project scheduling,
: Institute of Electrical and Electronics Engineers, Inc., 2011.
"An exploratory study of disaggregated clearing functions for production systems with multiple products",
International Journal of Production Research, no. ahead-of-print: Taylor & Francis, pp. 1–22, 2014.
"A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles",
Computers & Operations Research, vol. 24, no. 4: Elsevier, pp. 335–351, 1997.
"A hierarchical approach to FMS planning and control with simulation-based capacity anticipation",
International Journal of Production Research, vol. 49, no. 11: Taylor & Francis, pp. 3319–3342, 2011.
"Material handling considerations in the FMS loading problem with full routing flexibility",
International Journal of Production Research, vol. 50, no. 22: Taylor & Francis, pp. 6530–6552, 2012.
"Mathematical models for FMS loading and part type selection with flexible process plans",
European Journal of Industrial Engineering: Inderscience, 2013.
"Multi-attribute responsive dispatching strategies for automated guided vehicles",
International Journal of Production Economics, vol. 100, no. 1: Elsevier, pp. 65–75, 2006.
"Multi-dimensional clearing functions for aggregate capacity modelling in multi-stage production systems",
International Journal of Production Research, vol. 55, pp. 4164–4179, 2017.
"Operational aircraft maintenance routing problem with remaining time consideration",
European Journal of Operational Research, vol. 235, no. 1: Elsevier, pp. 315–328, 2014.
"A parametric fuzzy logic approach to dynamic part routing under full routing flexibility",
Computers & Industrial Engineering, vol. 55, no. 1: Elsevier, pp. 15–33, 2008.
"PSO-based and SA-based metaheuristics for bilinear programming problems: an application to the pooling problem",
Journal of Heuristics, vol. 22, pp. 147–179, 2016.
"A reference set based many-objective co-evolutionary algorithm with an application to the knapsack problem",
European Journal of Operational Research, vol. 300, pp. 405–417, 2022.
"Resource dedication problem in a multi-project environment",
Flexible Services and Manufacturing Journal, vol. 25, no. 1-2: Springer, pp. 206–229, 2013.
"A robust disaster preparedness model for effective and fair disaster response",
European Journal of Operational Research, vol. 280, pp. 479–494, 2020.
"Robust supply chain network design with multi-products for a company in the food sector",
Applied Mathematical Modelling, vol. 60, pp. 526-539, 2018.
"Simultaneous scheduling of machines and automated guided vehicles",
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, vol. 31, no. 12: Taylor & Francis, pp. 2857–2873, 1993.
"Solution of a Real-Life Vehicle Routing Problem with Meal Breaks and Shifts",
Green Transportation and New Advances in Vehicle Routing Problems: Springer International Publishing, pp. 131–157, 2020.
"A tabu search algorithm for parallel machine total tardiness problem",
Computers & Operations Research, vol. 31, no. 3: Elsevier, pp. 397–414, 2004.
"A tabu search algorithm for the single machine total weighted tardiness problem",
European Journal of Operational Research, vol. 176, no. 3: Elsevier, pp. 1423–1435, 2007.
"A time window approach to simultaneous scheduling of machines and material handling system in an FMS",
Operations Research, vol. 43, no. 6: INFORMS, pp. 1058–1070, 1995.