3 sonucu aktar:
Yazar Başlık Tür [ Yıl
] Süzgeçler: Yazar: Ali Tamer Ünal and First Letter Of Title is P [Clear All Filters]
"A probabilistic cost-based due date assignment model for job shops",
International Journal of Production Research, vol. 31, pp. 2817-2834, 1993.
"A parallel machine lot-sizing and scheduling problem with a secondary resource and cumulative demand",
International Journal of Production Research, vol. 56, pp. 3344-3357, 2018.
"Periodic Due Date Assignment with Family Setups",
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, vol. 26, pp. 0–0, 2019.