432 sonucu aktar:
[ Yazar(Desc)] Başlık Tür Yıl
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 
T
Taşkın, Z. C., S. Ağralı, A. Tamer Ünal, V. Belada, and F. Gökten-Yılmaz, "Mathematical Programming-Based Sales and Operations Planning at Vestel Electronics", Interfaces, vol. 45, issue 4, pp. 325-340, 2015.
Taşkın, Z. C., C. J. Smith, E. H. Romeijn, and J. F. Dempsey, "Optimal Multileaf Collimator Leaf Sequencing in IMRT Treatment Planning", Operations Research, vol. 58, no. 3, pp. 674–690, 2010.
Taşkın, Z. C., and C. J. Smith, "Branch-cut-price algorithms for solving a class of search problems on general graphs", Networks, vol. 70, pp. 4-18, 2017.
Taşkın, Z. C., C. J. Smith, and E. H. Romeijn, "Mixed-Integer Programming Techniques for Decomposing IMRT Fluence Maps Using Rectangular Apertures", Annals of Operations Research, vol. 196(1), pp. 799-818, 2012.
Tirler, G., P. Dalgaard, W. Hörmann, and J. Leydold, "An Error in the Kinderman-Ramage Method and How to Fix It", Computational Statistics and Data Analysis, vol. 47, no. 3, pp. 433–440, 2004.
Tombuş, A. Cilacı, N. Aras, and V. Verter, "Designing distribution systems with reverse flows", Journal of Remanufacturing, vol. 7, pp. 113–137, 2017.
Tuncel, K. Sinan, and M. Gokce Baydogan, "Autoregressive forests for multivariate time series modeling", Pattern Recognition, vol. 73, pp. 202 - 215, 2018.
Türkogullari, Y. Bogaç, N. Aras, K. I. Altinel, and C. Ersoy, "An efficient heuristic for placement, scheduling and routing in wireless sensor networks", Ad Hoc Networks, vol. 8, pp. 654–667, 2010.
Türkogullari, Y. Bogaç, Z. C. Taşkın, N. Aras, and K. I. Altinel, "Optimal Berth Allocation, Time-variant Quay Crane Assignment and Scheduling with Crane Setups in Container Terminals", European Journal of Operational Research, vol. 254, issue 3, pp. 985-1001, 2016.
Türkoğulları, Y. B., C. Z. Taşkın, N. Aras, and K. I. Altinel, "Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals", European Journal of Operational Research, vol. 254, pp. 985–1001, 2016.
Türkogullari, Y. Bogaç, N. Aras, K. I. Altinel, and C. Ersoy, "A column generation based heuristic for sensor placement, activity scheduling and data routing in wireless sensor networks", European Journal of Operational Research, vol. 207, pp. 1014–1026, 2010.
Türkoğulları, YB., N. Aras, K. I. Altinel, and C. Ersoy, "Optimal placement, scheduling, and routing to maximize lifetime in sensor networks", Journal of the Operational Research Society, vol. 61, no. 6: Nature Publishing Group, pp. 1000–1012, 2010.
Türkogullari, Y. Bogaç, N. Aras, K. I. Altinel, and C. Ersoy, "Optimal placement and activity scheduling to maximize coverage lifetime in wireless sensor networks", International Symposium on Computer and Information Sciences, 2007.
Türkogullari, Y. Bogaç, N. Aras, K. I. Altinel, and C. Ersoy, "An efficient heuristic for placement, scheduling and routing in wireless sensor networks", International Symposium on Computer and Information Sciences, 2008.
Türkogullari, Y. Bogaç, Z. C. Taşkın, N. Aras, and K. I. Altinel, "Optimal berth allocation and time-invariant quay crane assignment in container terminals", European Journal of Operational Research, vol. 235, no. 1, pp. 88–101, 2014.
U
Ulusoy, G., F. Sivrikaya-Şerifoǧlu, and Ü. Bilge, "A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles", Computers & Operations Research, vol. 24, no. 4: Elsevier, pp. 335–351, 1997.
Ulusoy, G., and Ü. Bilge, "Simultaneous scheduling of machines and automated guided vehicles", THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, vol. 31, no. 12: Taylor & Francis, pp. 2857–2873, 1993.
Ü
Ünal, A. Tamer, and A. S. Kiran, "BATCH SEQUENCING", IIE Transactions, vol. 24, pp. 73-83, 1992.
Ünal, A. Tamer, R. Uzsoy, and A. Kiran, "Rescheduling on a single machine with part type dependent setup times and deadlines", Annals of Operations Research, vol. 70, pp. 93–113, Jan, 1997.
Ünal, A. Tamer, S. Ağralı, and Z. C. Taşkın, "A strong integer programming formulation for hybrid flowshop scheduling", Journal of the Operational Research Society, vol. 71, pp. 2042-2052, 2020.
Y
Yasarcan, H., "Stock management in the presence of significant measurement delays", System Dynamics Review, vol. 27, no. 1: Wiley Online Library, pp. 91–109, 2011.
Yasarcan, H., and Y. Barlas, "A generalized stock control formulation for stock management problems involving composite delays and secondary stocks", System dynamics review, vol. 21, no. 1: Wiley Online Library, pp. 33–68, 2005.
Yasarcan, H., "Information Sharing in Supply Chains: A Systemic Approach", The 29th International System Dynamics Conference, Washington, DC, USA: System Dynamics Society (http://www.systemdynamics.org/conferences/2011/index.htm), 2011.
Yasarcan, H., and Y. Barlas, "A general stock control formulation for stock management problems involving delays and secondary stocks", The 21st International System Dynamics Conference, New York City, USA: System Dynamics Society (http://www.systemdynamics.org/conferences/2003/index.htm), 2003.
Yasarcan, H., "Improving understanding, learning, and performances of novices in dynamic managerial simulation games", Complexity, vol. 15, no. 4: John Wiley & Sons, Ltd, pp. 31–42, 2010.
Yasarcan, H., and Y. Barlas, "Stable stock management heuristics when the outflow is proportional to the control stock", The 23rd International System Dynamics Conference, Boston, MA, USA: System Dynamics Society (http://www.systemdynamics.org/conferences/2005/index.htm), 2005.
Yasarcan, H., and T. Tanyolaç, "A Soft Landing Model and an Experimental Platform as an Introductory Control Design Tool", The 30th International System Dynamics Conference, St. Gallen, Switzerland: System Dynamics Society (http://www.systemdynamics.org/conferences/2012/index.html), 2012.
Yau, S. S., N. Ye, H. S. Sarjoughian, D. Huang, A. Roontiva, M. Gokce Baydogan, and M. A. Muqsith, "Toward Development of Adaptive Service-Based Software Systems", IEEE Transactions on Services Computing, vol. 2, pp. 247-260, 2009.

Pages